Hands-on experience in the development, construction and operation of waste disposal
and waste-to-energy (WTE), applied towards a broader Circular Economy and ESG model:
transforming waste from an environmental liability into a resource, while integrating
energy, materials, water, community participation and measurable ESG outcomes.
That experience is the reason we insist on measuring before specifying. Very few
people in this market have run a waste facility through design, construction and
live operation, and seen at first hand what a wrong assumption about feedstock
actually costs.
At Bravo SCE this covers technical oversight: writing and specifying each package,
checking contractor work against the agreed method, and verifying outcomes against
the baseline.